21FT En39 Certified Scaffold Tube Carbon Steel Scaffolding Tube Scaffold Poles & Steel Pipe

Product Details
Customization: Available
After-sales Service: Technic Support
Warranty: 3 Years
Still deciding? Get samples of US$ 1000/Ton
Request Sample
Other, Group Corporation
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
6000000 RMB
Plant Area
101~500 square meters
  • 21FT En39 Certified Scaffold Tube Carbon Steel Scaffolding Tube Scaffold Poles & Steel Pipe
  • 21FT En39 Certified Scaffold Tube Carbon Steel Scaffolding Tube Scaffold Poles & Steel Pipe
  • 21FT En39 Certified Scaffold Tube Carbon Steel Scaffolding Tube Scaffold Poles & Steel Pipe
  • 21FT En39 Certified Scaffold Tube Carbon Steel Scaffolding Tube Scaffold Poles & Steel Pipe
  • 21FT En39 Certified Scaffold Tube Carbon Steel Scaffolding Tube Scaffold Poles & Steel Pipe
  • 21FT En39 Certified Scaffold Tube Carbon Steel Scaffolding Tube Scaffold Poles & Steel Pipe
Find Similar Products

Basic Info.

Model NO.
HY-SP-019
Material
Steel
Type
Fixed
Structural Style
Multi-Pole Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Floor Type Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Building Scaffold
Surface Treatment
Hot DIP Galvanized/Pre-Galvanized/Painted
Steel
Q195/Q235/355
Testing Report
SGS
MOQ
1 Piece
Technique
ERW
Usage
Building/Projects/Oil Gas/Construction
Transport Package
Steel Strapped
Specification
33/38/42/48/60/72
Trademark
HUAYOU
Origin
China
HS Code
7306309000
Production Capacity
100000 Tons/Year

Product Description

FIRST. Company Profile

Tianjin Huayou Scaffolding Co., Ltd is a company specialized in producing and selling of scaffolding products and other related building materials and machines. Company located in Tianjin City, which is the largest manufacturing base of steel and scaffolding products. Furthermore, there is the largest sea port in China north area and easier to transport cargos all over the world.With years work, Huayou has made a complete product system and served materials to the different areas of the world like SouthEast Asia Market, MiddleEast Market; North & South America Market; Austrilia Market; Eroupe Market etc, we warmly welcome your inquiry.

SECOND. Scaffolding Tube Information Details

1.Scaffolding tube specification
Scaffolding Tube, Scaffolding Pipe, Steel Pipe, Steel Tube, BS, EN, ASTM, JIS standard, If you have requirements, we will try our best to support you.



 
OD Wall Thickness Normal Length M Customized
21mm(1/2'') 0.6mm--2.2mm 0m--6m Yes
26mm(3/4'') 0.6mm--2.2mm 0m--6m Yes
33.4mm(1'') 0.6mm--2.2mm 0m--6m Yes
34mm 1.4mm--4.0mm 0m--6m Yes
38mm 1.4mm--4.0mm 0m--6m Yes
42.2mm(1-1/4'') 0.6mm--2.2mm 0m--6m Yes
42mm 1.4mm--4.0mm 0m--6m Yes
48.3mm(1-1/2'') 1.8mm-4.0mm 0m--6m Yes
48.6mm(1-1/2'') 1.8mm--2.4mm 0m--6m Yes
60.3mm(2'') 1.8mm-4.0mm 0m--6m Yes
88.9mm(3'') 2.0mm-5.5mm 0m--6m Yes
114.3mm(4'') 2.0mm--10.0mm 6m--12m Yes
141.3mm(5'') 2.5mm--10.0mm 6m--12m Yes
165mm(6'') 2.5mm--10.0mm 6m--12m Yes
219.1mm(8'') 2.5mm--10.0mm 6m--12m Yes
 
2. Other Parameter
 
Materials Q195-Q355,A53-A369,#10--#45 steel
Tolerance +/-3%
Surface Treatment Oiled/Black/Painted/Galvanized
Processing Service Bending/Punching/Cutting
Testing Report SGS
Package Steel Strap/anti-water roof
Engrave marking as your requirements
Production Capacity 10000 tons/Month
Delivery time 7-20 days

3. Inspection 
We have strict inspection procedure for steel pipe. Raw materials test, welding test, surface treatment test and packages management. For each batch, after inspection and mark them, then can load containers.

21FT En39 Certified Scaffold Tube Carbon Steel Scaffolding Tube Scaffold Poles & Steel Pipe

THIRD. Production Procedure

1. Raw materials Purchasing

a. Strict chemical componets and mechnical testing for pure steel grade

2.Production processing
b. Welding inspection
c. Cutting end clean
d. Surface treatment inspection and pack them.

3.Third party testing
SGS, CCIC

FORTH. FACTORY WORKSHOP AND LOADING

Our steel pipe factory have 3000 meters with 30 workers, although not large scale, we can give you high production capacity support.

21FT En39 Certified Scaffold Tube Carbon Steel Scaffolding Tube Scaffold Poles & Steel Pipe
FIFTH. CERTIFICATE
According to customers' requirements, we will arrange all our order materials to making SGS test. As a professional scaffolding steel pipe supplier, we guarantee all our products and give you more honest support. Quality is No.1 place forever. 

21FT En39 Certified Scaffold Tube Carbon Steel Scaffolding Tube Scaffold Poles & Steel PipeSIXTH. Other Service
We have more than 10 years scaffolding service expenrience for customers all over the world. Not only scaffolding products you can buy, we also can help you purchase others if you need. One-stop station purchasing service can make your work efficient.
Waiting for your warm inquiry and long term cooperation.

21FT En39 Certified Scaffold Tube Carbon Steel Scaffolding Tube Scaffold Poles & Steel Pipe
FAQ:

Q1: Where is the loading port?

A: Tianjin Xin port

Q2: What's the MOQ of the product?
A: Different item has different MOQ, can be negotiated.

Q3: What certificates do you have?
A: We have ISO 9001, SGS etc.

Q4: Can I get some samples?    
A: Yes, Sample is free, but shipping cost is on your side. 

Q5: How long is the production cycle after ordering?
A: Generally need around 20-30 days.

Q6: What is the payment methods?
A: T/T or 100% irrevocable LC at sight, can be negotiated.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier