Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher

Product Details
Customization: Available
After-sales Service: Remote or on-Site Technical Support
Warranty: 3years
Still deciding? Get samples of US$ 5/Piece
Request Sample
Other, Group Corporation
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
6000000 RMB
Plant Area
101~500 square meters
  • Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher
  • Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher
  • Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher
  • Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher
  • Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher
  • Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher
Find Similar Products

Basic Info.

Model NO.
117
Material
Steel
Type
Fixed
Structural Style
Multi-Pole Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Floor Type Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Building Scaffold
Sruface Treatment
Galvanized/Hot DIP Galvanized/Painted
Steel Grade
Q355 / Q235
Certificate
SGS/ISO
MOQ
1PCS
OEM
Available/Customized
Application
Building/Tunnel/Bridge Construction
Advantage
Heavy Loads, Stable, Flexible, Easy Assembling
Transport Package
by Bundle or by Pallet, Suitable for Sea Transport
Specification
48.3mm
Trademark
HUAYOU
Origin
China
HS Code
7308400000
Production Capacity
50000tons /Year

Product Description

FIRST. COMPANY PROFILE:

Tianjin Huayou Scaffolding Co., Ltd is a company specialized in producing and selling of scaffolding products and other related building materials. Company located in Tianjin City, which is the largest manufacturing base of steel and scaffolding products. Furthermore, there is the largest sea port in China north area and easier to transport cargos all over the world.With years work, Huayou has made a complete product system and served materials to the different areas of the world like SouthEast Asia Market, MiddleEast Market; North & South America Market; Austrilia Market; Eroupe Market etc, we warmly welcome your inquiry.

SECOND. PRODUCT INTRODUCTION:

Cup Lock scaffolding is one of the important scaffolding systems in the world. As a modular scaffolding system, it can be used in different projects as external or internal support. Its advantages like Heavy Loads, Stable, Flexible, Easy Assembling make it widely used at home and abroad.
 
Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher
Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher



1)Cup Lock Scaffolding Vertical/Standard  
 NAME   LENGTH(M) Normal   SIZE(MM) Surface treatment Material Steel Grade
Vertical/Standard      L=0.5       OD48.3, THK 2.5-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Q235/Q355
Vertical/Standard      L=1.0       OD48.3, THK 2.5-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Q235/Q355
Vertical/Standard      L=1.5       OD48.3, THK 2.5-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Q235/Q355
Vertical/Standard      L=2.0       OD48.3, THK 2.5-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Q235/Q355
Vertical/Standard      L=2.5       OD48.3, THK 2.5-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Q235/Q355
Vertical/Standard      L=3.0       OD48.3, THK 2.5-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Q235/Q355

2)Cup Lock Scaffolding Horizontal Ledger
NAME   LENGTH(M) SIZE(MM) Surface treatment Customized
Horizontal/Ledger L=0.6/0.65/0.7 OD48.3, THK 2.0-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted
Yes
Horizontal/Ledger L=0.9/0.95 OD48.3, THK 2.0-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
Horizontal/Ledger L=1.2/1.219 OD48.3, THK 2.0-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
Horizontal/Ledger L=1.5/1.524 OD48.3, THK 2.0-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
Horizontal/Ledger L=1.8/1.829 OD48.3, THK 2.0-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
Horizontal/Ledger L=2.1 OD48.3, THK 2.0-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
Horizontal/Ledger L=2.4 OD48.3, THK 2.0-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes

3)Cup Lock Diagonal Bracing 
NAME    LENGTH(M)         SIZE(MM) Surface treatment Customized
Diagonal Brace  L=0.9*1.5        OD33/42/48.3, THK1.8-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
Diagonal Brace  L=1.2*1.5         OD33/42/48.3, THK1.8-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
Diagonal Brace  L=1.5*1.5         OD33/42/48.3, THK1.8-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
Diagonal Brace  L=1.8*1.5        OD33/42/48.3, THK1.8-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
Diagonal Brace  L=2.1*1.5        OD33/42/48.3, THK1.8-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
Diagonal Brace  L=1.8*2.0         OD33/42/48.3, THK1.8-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
Diagonal Brace  L=2.4*2.0         OD33/42/48.3, THK1.8-4.0 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
 
4)Ringlock Adjustable Base Jack 
Name    LENGTH(MM)            SIZE(MM) Surface treatment Customized
Base Jack L=450/600/700/800/1000             38*5, 150*150*5 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes
U-Head Jack L=450/600/700/800/1000               38*5,150*150*50*50 Hot Dip Galv./ Electro-Galv./Power coated/Painted Yes

PRODUCTION PROCESS:

                     *PIPE CUTTING                                                                      *WELDING                                            *GALVANIZING & PACKING

1) Pipe cutting
We just use  the automachine cutting blade to keep all our length controlled within 1mm, and pipe end will be plain without any splinter

2) Welding
All our worker are professional and have more than 5 years welding experience. They know how to make goods perfect.

3) Sanding
This is very important process. But many factories ignore it. Before send to make surface treatment, we will ask our workers to sanding the welding places to protect beautiful and no fake welding. Thus all goods will be nice to make galvanized or painted.

4)Surface treatment

To be honest, Galvanized factory is different to quality requirements. We just choose one better and meet all coating and surface requirements. 
Hot dip galvanized, electro-galvanized, powder coated, and painted.


All process is connected with our cost. If you have high quality requirements, just tell me, we can meet all.

Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher


PACKAGE & LOADING:

Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher



-By bundle or by steel pallet, as requested.

CERTIFICATE:

Building Cuplock with Accessories Metal Professional Scaffolding Props Peri Layher
OTHER RELATED PRODUCTS:

Building Cuplock with Accessories Metal Professional Scaffolding Props Peri LayherOne-stop Station Purchasing for all scaffolding materials.
Welcome to all your kind inquiry.


FAQ:

Q1: Where is the loading port?

A: Tianjin Xin port

Q2: What's the MOQ of the product?
A: Different item has different MOQ, can be negotiated.

Q3: What certificates do you have?
A: We have ISO 9001, SGS etc.

Q4: Can I get some samples?    
A: Yes, Sample is free, but shipping cost is on your side. 

Q5: How long is the production cycle after ordering?
A: Generally need around 20-30 days.

Q6: What is the payment methods?
A: T/T or 100% irrevocable LC at sight, can be negotiated.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier