• Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System
  • Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System
  • Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System
  • Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System
  • Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System
  • Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System

Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System

After-sales Service: Yes
Warranty: Years
Material: Steel
Type: Fixed
Structural Style: Multi-Pole Scaffolding
Framework: Combined Scaffolding
Samples:
US$ 0.95/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Other, Group Corporation

Basic Info.

Supporting Mode
Floor Type Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Building Scaffold
Raw Material
Metal
Grand
Q235
Surface Treatment
Electro Galvaznied/Hot DIP Galvanized
Usage
48.3/48.6mm Pipe
Production Procedure
Pressed
Market
Overseas
Function
Export
Transport Package
Pallet
Specification
48.6mm
Trademark
HUAYOU
Origin
China
HS Code
7308400000
Production Capacity
5000000pieces/Year

Product Description

 First. Company profile

 
Tianjin Huayou Scaffolding Co., Ltd is located in Tianjin City, which is the largest manufacturing base of steel and scaffolding products. Furthermore, it is a port city that easier to transport cargo to every port all over the world.
We specialize in the production and sales of various scaffolding products, such as ringlock system, steel board, frame system, shoring prop, adjustable jack base, scaffolding pipes and fittings, couplers, cuplock system, kwickstage system, Aluminuim scaffolding system and other scaffolding or formwork accessories. Currently, our products are export to many countries that from South East Asia region, Middle East Market and Europe, America, etc.
Our principle: "Quality First, Customer Foremost and Service Ultmost." We devote ourselves to meet your
requirements and promote our mutually beneficial cooperation.

Second.  Products Introduction

1. Pressed BS1139/EN74 standard scaffolding Coupler and fittings

 
Commodity Specification mm Normal Weight g Customized Raw Material Surface treatment
BS1139/EN74 Double coupler 48.3x48.3mm 820g yes Q235/Q355 eletro Galvanized/ hot dip Galvanized
BS1139/EN74 Swivel coupler 48.3x48.3mm 1000g yes Q235/Q355 eletro Galvanized/ hot dip Galvanized
BS1139/EN74 Putlog coupler 48.3mm 580g yes Q235/Q355 eletro Galvanized/ hot dip Galvanized
BS1139/EN74 Board retaining coupler 48.3mm 570g yes Q235/Q355 eletro Galvanized/ hot dip Galvanized
BS1139/EN74 Sleeve coupler 48.3x48.3mm 1000g yes Q235/Q355 eletro Galvanized/ hot dip Galvanized
BS1139/EN74 Inner Joint Pin Coupler 48.3x48.3 820g yes Q235/Q355 eletro Galvanized/ hot dip Galvanized
BS1139/EN74 Beam Coupler 48.3mm 1020g yes Q235/Q355 eletro Galvanized/ hot dip Galvanized

2. Products details

1) Package


We all scaffolding clamp packed with wooden pallets or steel pallets, which can give you high protection when shipment and also can design your logo.
Especially, JIS standard clamp and Korean type clamp, will pack them with carton box and 30 pcs for each carton.
For BS standard scaffolding fittings, will pack them with steel pallet and woven bag.



2) Loading show

All our production is for overseas markets, easy to pack and easy to load container. Not worry about your goods when shipping.
Almost one day, we can load 10 containers and keep high efficient working.

Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular SystemSteel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System
Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System

Third. Our advantages

1. High quality guarantee
Quality is No.1 factor and also is company life. We have professional technicion and more than 10 years workers who can help us to control quality, but not inspector. 

2.High working efficiency
We have strict and professional working training to all workers. And very strict production procedure can make all our producing step by step.

3.6S managment system
4.High Capable production
5. Near to Port
6.Low cost Labour
7.Near to raw materials site




Forth. Factory information

1. Workshop

All our scaffolding clamp workshop area have 5000 Square meters and can produce all kinds of pressed coupler, JIS standard, Korean type, BS standard and other fittings ect. We have more than 100 staffs to produce all kinds of coupler and package and loading containers.

Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System
Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System


2. Mould Room

Until now we already have mature mould for all kinds of scaffolding couplers. Depand one different requirements, we can meet all your standard. Only you can tell me your demand.

Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System

3. Warehouse

Now, just our warehouse have more than 1000 square meters and have enough space for stock. 

Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System

FIFTH. CERTIFICATE

Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular SystemFAQ:

Q1: Where is the loading port?

A: Tianjin Xin port

Q2: What's the MOQ of the product?
A: Different item has different MOQ, can be negotiated.

Q3: What certificates do you have?
A: We have ISO 9001, SGS etc.

Q4: Can I get some samples?    
A: Yes, Sample is free, but shipping cost is on your side. 

Q5: How long is the production cycle after ordering?
A: Generally need around 20-30 days.

Q6: What is the payment methods?
A: T/T or 100% irrevocable LC at sight, can be negotiated.


Welcome to send your inquiry and cannot wait to make cooperation with you!
One-stop station Purchasing for all scaffolding products.
Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now