• En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction
  • En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction
  • En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction
  • En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction
  • En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction
  • En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction

En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction

After-sales Service: Remote or on-Site Technical Support
Warranty: 3years
Material: Steel
Type: Fixed
Structural Style: Multi-Pole Scaffolding
Framework: Combined Scaffolding
Samples:
US$ 2/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Other, Group Corporation

Basic Info.

Supporting Mode
Floor Type Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Building Scaffold
Sruface Treatment
Galvanized
Steel Grade
Q235 / Q345
Certificate
SGS / ISO
MOQ
1000PCS
OEM
Available
Application
Building/Tunnel/Bridge Construction
Technology
Pressed or Drop Forged
Standard
BS1139 / En74
Classification
BS/JIS/Korea/American/Germany
Connection Type
Tube and Clamp Connection Scaffold
Color
Silver / Yellow Zinc
Transport Package
by Pallet, Suitable for Sea Transport
Specification
48.3mm
Trademark
HUAYOU
Origin
China
HS Code
7308400000
Production Capacity
500000PCS /Year

Product Description

COMPANY PROFILE:

Tianjin Huayou Scaffolding Co., Ltd is a company specialized in producing and selling of scaffolding products and other related building materials. Company located in Tianjin City, which is the largest manufacturing base of steel and scaffolding products. Furthermore, there is the largest sea port in China north area and easier to transport cargos all over the world.With years work, Huayou has made a complete product system and served materials to the different areas of the world like SouthEast Asia Market, MiddleEast Market; North & South America Market; Austrilia Market; Eroupe Market etc, we warmly welcome your inquiry.

PRODUCT INTRODUCTION:


Tube and fittings scaffolding is a traditional scaffolding, all the tubes are joined by clamps vertically and horizontally. Clamps are fixed by screwed bolts. The diamater of the tubes is usually 48.3mm, so the diameter of the clamps are also 48.3mm. It is widely used in commerical construction, residential construction, industrial construction, oil and gas industry, bridge construction etc.
 
NO. ITEM WEIGHT (KG)
1 Drop forged fixed coupler British type: 48.3 x 48.3 mm 0.97
2 Drop forged swivel coupler British type: 48.3 x 48.3 mm 1.12
3 Drop forged putlog coupler 0.63
4 Pressed sleeve, end to end connector 1.00
5 Drop forged fixed girder coupler 1.50
6 Drop forged swivel girder coupler 1.60
7 Ladder coupler 0.72
8 Drop forged inner joint pin 1.10
9 Board retaining coupler 0.63
10 Pressed right angle coupler British type 0.85
11 Pressed swivel coupler British type 1.02
12 Pressed putlog coupler 0.63
13 Pressed inner joint pin 0.68
14 Drop forged fixed coupler American type: 48.3 x 48.3 mm 1.65
15 Drop forged swivel coupler American type: 48.3 x 48.3 mm 1.75
16 Drop forged half coupler British type 0.65
17 Drop forged half coupler American type 0.92
18 Drop forged fixed coupler German type: 48.3 x 48.3 mm 1.05
19 Drop forged swivel coupler German type: 48.3 x 48.3 mm 1.25
En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction
INSTALLATION INSTRUCTION:

First step: Open the cap;
Second step: Put the tube into the cap;
Third step: Close the cap and tighten the bolts.
 
PRODUCTION PROCESS:

*  RAW MATERIAL    *HIGH TEMPERATURE FORGING    *PRESSED    *ASSEMBLING    *READY TO PACK                                
En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction
PACKAGE & LOADING:


-By Wooden pallet or steel pallet, as requested, suitable with sea transportation.
En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction
CERTIFICATE:

En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction
OTHER RELATED PRODUCTS:

En74/BS1139 Galvanized Steel Pipe Fitting Scaffolding System Hardware Scaffold Clamps for Construction
FAQ:

Q1: Where is the loading port?
A: Tianjin Xin port

Q2: What's the MOQ of the product?
A: Different item has different MOQ, can be negotiated.

Q3: What certificates do you have?
A: We have ISO 9001, SGS etc.

Q4: Can I get some samples?    
A: Yes, Sample is free, but shipping cost is on your side. 

Q5: How long is the production cycle after ordering?
A: Generally need around 20-30 days.

Q6: What is the payment methods?
A: T/T or 100% irrevocable LC at sight, can be negotiated.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now