• China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
  • China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
  • China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
  • China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
  • China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
  • China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139

China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139

After-sales Service: Yes
Warranty: Years
Material: Steel
Type: Fixed
Structural Style: Multi-Pole Scaffolding
Framework: Combined Scaffolding
Samples:
US$ 1/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Other, Group Corporation

Basic Info.

Model NO.
TJHY-A82
Supporting Mode
Floor Type Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Building Scaffold
Raw Material
Metal
Grand
Q235
Surface Treatment
Electro Galvanized / Hot DIP Galvanized
Usage
48.3/48.6mm Pipe
Production Procedure
Pressed & Forged
Rod Grade
8.8
Transport Package
Pallet
Specification
48.3mm
Trademark
HUAYOU
Origin
China
HS Code
7308400000
Production Capacity
5000000pieces/Year

Product Description

1. Pressed scaffolding coupler fittings:
 
NAME STANDARD SIZE WEIGHT / KG MATERIAL SURFACE TREATMENT
Double coupler BS1139 48.3mm 0.82 Q235 Eletro-Galvanized
Swivel coupler BS1139 48.3mm 1.00 Q235 Eletro-Galvanized
Half Coupler BS1139 48.3mm 0.45 Q235 Eletro-Galvanized
Putlog coupler BS1139 48.3mm 0.58 Q235 Eletro-Galvanized
Board retaining coupler BS1139 48.3mm 0.57 Q235 Eletro-Galvanized
Sleeve coupler BS1139 48.3mm 1.00 Q235 Eletro-Galvanized
Inner Joint Pin Coupler BS1139 48.3mm 0.60 Q235 Eletro-Galvanized
Beam Coupler BS1139 48.3mm 1.00 Q235 Eletro-Galvanized
Limpet Coupler BS1139 48.3mm 0.32 Q235 Eletro-Galvanized
Ladder Coupler BS1139 48.3mm 0.45 Q235 Eletro-Galvanized
Fixed Clamp JIS/KOREA 48.6mm 0.65 Q235 Eletro-Galvanized
Swivel Clamp JIS/KOREA 48.6mm 0.65 Q235 Eletro-Galvanized
Inner Joint Pin JIS/KOREA 48.6mm 0.65 Q235 Eletro-Galvanized
Beam Clamp JIS/KOREA 48.6mm 1.00 Q235 Eletro-Galvanized
China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
2. Drop Forged Scaffolding Coupler Fittings:
 
NAME STANDARD SIZE WEIGHT / KG MATERIA SURFACE TREATMENT
Double Coupler BS1139/EN74 48.3mm 0.98 Q235 Electro-Gal. / HDG
Swivel Coupler BS1139/EN74 48.3mm 1.12 Q235 Electro-Gal. / HDG
Half Coupler BS1139/EN74 48.3mm 0.52 Q235 Electro-Gal. / HDG
Board Retainning Coupler BS1139/EN74 48.3mm 0.62 Q235 Electro-Gal. / HDG
Putlog Coupler BS1139/EN74 48.3mm 0.63 Q235 Electro-Gal. / HDG
Girder/Beam Coupler BS1139/EN74 48.3mm 1.50 Q235 Electro-Gal. / HDG
Sleeve Coupler BS1139/EN74 48.3mm 1.00 Q235 Electro-Gal. / HDG
Inner Joint Coupler BS1139/EN74 48.3mm 1.05 Q235 Electro-Gal. / HDG
China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
PACKAGES & LOADING:

1. By bulk with carton box: Save cost & load more, but difficult to load & unload;
2. By wooden pallets or steel pallets: Easy to load & unload;
3. As request, suitable for sea transportation.

 
China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139

COMPANY PROFILE:

Tianjin Huayou Scaffolding Co., Ltd is one of the largest manufacturing base of steel and aluminum scaffolding products.

We specialize in the production and sales of various scaffolding products, such as Ringlock system, steel Board, Frame system, Jack base, Pipes and fittings, Couplers, Cuplock system, Kwickstage system, Aluminuim system and other scaffolding or formwork accessories. With the effort of over 10 years experience team, Huayou products has been exported to different countries and clients cover different areas like South East Asia market, Middle East Market, Europe, America, Austrilia etc.
 
Our principle: "Quality First, Customer Foremost and Service Ultmost." We devote ourselves to meet your requirements and promote our mutually beneficial cooperation.

Warmly welcome your inquiry support.

Workshop:
China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
Scaffolding clamp workshop area has 5000 square meters and can produce all kinds of pressed & forged couplers, JIS standard, Korean type, BS standard and other fittings ect. We have more than 100 staffs to produce all kinds of coupler and pack and load containers.

Mould Room:
Till now we already have mature mould for all kinds of scaffolding couplers. We can also design and produce as your requirement.
China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139

Warehouse:
China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
The warehouse is more than 1000 square meters and has enough space to stock and assure the good quality goods to you before we load. 
CERTIFICATE:
 
China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139
China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139

FAQ:

Q1: Where is the loading port?
A: Tianjin Xin port

Q2: What's the MOQ of the product?
A: Different item has different MOQ, can be negotiated.

Q3: What certificates do you have?
A: We have ISO 9001, SGS etc.

Q4: Can I get some samples?    
A: Yes, Sample is free, but shipping cost is on your side. 

Q5: How long is the production cycle after ordering?
A: Generally need around 20-30 days.

Q6: What is the payment methods?
A: T/T or 100% irrevocable LC at sight, can be negotiated.


RELATED PRODUCTS:

China Supply Building Material Scaffolding Clamp Steel Pipe Scaffolding Inner Joint Pin BS1139

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now